our operations
Troilus
 

click for satellite view


Location: Canada
Ownership: 100%
Type of mine: open pit
Type of ore body: gold and copper deposit
Primary metal: gold
Secondary metal: copper
End product: copper concentrate, gold doré
Mining method: open pit
Opened: 1995
Expected mine life: 2009
Average reserve grades: gold – 0.7 grams per tonne, copper – 0.1%
Infrastructure: close to roads and rail
Employees: 243
Contractors: 37

As at December 31, 2008.

Troilus is an open pit gold mine located in northwestern Quebec. The mine produces two products: a high gold, low copper-containing copper concentrate, and gold doré (bullion).

In 2008, 78 percent of Troilus’s revenue was from gold and 22 percent was from copper.


Targets and results


     

           three months ended
March 31

         year ended
December 31


objective

2009 2008 change 2008 2007  change 2009
Tonnes of ore milled(000's)     1,500 1,400 + 7% 5,800 6,000 - 3% 6,200
Tonnes of ore milled per day   16,700 15,400 + 7% 15,900 16,500 - 3% 16,900
Strip ratio   0.1 1.2 - 89% 1.4 1.1 + 27% 0.3
Grades

gold
(grams/tonne)

1.44 0.93 + 55% 0.96 0.87 + 10% 0.82
  copper
(percent)
0.20 0.07 + 186% 0.10 0.05 +100% 0.11
Mill recoveries (percent) gold 85 84 + 1% 84 82 + 2% 81
  copper 95 91 + 4% 93 88 + 6% 92
Production gold
(ounces)
58,100 35,000 + 66% 151,300 138,400 + 9% 132,200
  copper
(tonnes)
2,800 900 + 211% 5,700 2,800 + 104% 6,000
Cost per tonne of ore milled(C$) $13 $14 - 7% $15 $13 + 15% $10


quick links

Download the Troilus section from our first quarter press release for the most recent update.

Download the Troilus section from our 2008 annual review.

Troilus 2007 sustainability report
(PDF English - 1,889 kB)



Latest news
Access any of our news releases in this section

 
Copyright © 2006 Inmet Mining Corporation. All rights reserved.